Gantt

An editable Gantt chart that replaces the built-in one, with dependencies, critical path, baselines and a cross-project view.

Documented for version 1.0.1 · Verified against 932d12e

An editable schedule where the built-in Gantt is a picture. Drag a bar to move it, drag its edge to resize, draw a dependency between two issues, and see the Critical path through the plan. Baselines record what you promised so Drift can show what actually happened. There is a per-project chart on the Gantt tab and a Gantt — all projects view across everything you can see.

Every change is an ordinary issue edit underneath, the same rules, the same history entry, the same notifications, so a drag can never be a way to move a date without leaving a trail.

What you can do

Availability
Business and above.
Turn it on
Nothing to turn on.
Permissions
Editing a bar needs the ordinary issue permissions.
Using it
Open a project's Gantt tab, or Gantt — all projects from the top menu.

Common questions

Progress will not change by dragging.

Administration → Settings → Issue tracking → Calculate the issue done ratio with is set to use the status. In that mode the value is derived from the status and a drag is refused up front, rather than accepted and then ignored on the next load.

A save was refused and the bar sprang back.

Someone else changed that issue after your chart was drawn. The current row is sent back so the chart redraws rather than overwriting whoever saved first.

A dependency I drew did not appear.

The server refused it, a cycle, or a cross-project rule. The edge is confirmed before it is drawn precisely so an invalid dependency never flashes onto the chart.